This is a flat roof which we installed in Toronto. During our assessment of the rooftop for the FIT project, our engineering and construction team identified areas where the roof was not horizontal enough.
We recognized that this could potentially cause water drainage issues, as well as electrical issues such as arc faults and short circuits.
To address this issue, our team proposed a comprehensive solution that included the installation of concrete blocks beneath the affected areas of the PV array. This would elevate the panels to the appropriate angle and ensure that they were installed safely and securely, without the risk of arc faults or short circuits.
Our team carefully considered the budget for this project and ensured that our proposed solution was both effective and cost-efficient. Our commitment to exceptional service and support ensures that clients have peace of mind throughout the project.