Our engineering and construction team conducted a comprehensive assessment of the site to begin the design to build process.
One of the challenges was the steep slope of the ground where the solar panel foundation was planned to be installed.
In collaboration with our engineer consultant and the contractor company, our team utilized specialized equipment and excavation techniques to safely remove any rocks and debris on the steep slope.
Blasting was implemented as a safe and effective solution for rock removal to ensure that the foundation of the solar panels would be installed on a level surface.
To ensure safety and compliance, our team worked closely with local authorities to obtain all necessary permits and approvals before initiating any blasting activity.
We followed strict safety protocols and utilized the latest technology to ensure that the blasting process was carried out with minimal disruption to the surrounding area.